Construction Update: March 2007


Basement Floor SlabThe remaining footings for the building have been poured, and the basement walls have been constructed.    Deliveries of crushed rock for the base of the concrete basement floor are arriving on campus.  The crushed rock is covered with a thick plastic to form a moisture barrier between the ground and the concrete floor.

The first section of the concrete slab was poured on March 21st.  The remaining sections will be poured by mid-April.  The structural steel work will begin in May.  A lack of rainy days in Fresno this winter and spring has allowed the project to continue on schedule!

Basement Floor PreparationThe library is scheduled to be completed in the fall of 2008 at a cost of $105 million, which includes Table Mountain's $10 million gift.